This summer, RW has several improvement projects planned. The
temporary classrooms are being removed, lockers installed, and security cameras
added to the exterior of the building.
Several years ago, temporary classrooms were built in each of our
three pods to accommodate our increasing student population. When
Millbrooke Elementary opens its doors next year, we will decrease from 680 to
approximately 550 students. Existing classrooms can accommodate the 4
sections for each grade, and our students will have extra space to work on projects or collaborate as a grade level
Students will be excited to learn that they will have their own
locker next year. The light-grey, double-tier lockers will be installed
under the existing casework outside the classrooms. Our pod areas will
look tidy when students store their coats and backpacks in lockers. There will not be a lock and kids will not need to memorize a combination. .
Finally, security cameras will be installed on the exterior of our building.
All front office staff members will have access to the security
feeds from their desk. Our current video monitor will also be upgraded to provide a clear image of each visitor.
It's Great to be a Tiger,
It's Great to be a Tiger,